欧美一级在线观看_欧洲精品免费AV一区二区_欧美中日韩免费观看网站_欧美一级特黄刺激爽大片_欧美性猛交XXXX乱大交3_欧美亚洲激情在线_欧美日韩巨臀中文字幕精品

A company specializing in the design, manufacture and sale of blow molding equipment.

張家港市王道機械有限公司
Current position: Home >> News >> Technical Knowledge

Blow molding machine operation process

2019-04-16

The brands of blow molding machines are endless. According to preliminary statistics, there are nearly 100 domestic blow molding machine manufacturers. The operation interfaces of blow molding machines manufactured by different manufacturers have different levels of difference, in order to facilitate the deep level of blow molding machines for industry personnel. Understand, here's a brief introduction to the operation of the blow molding machine:

1. The blow molding machine cannot be operated by personnel who have not been professionally trained.
2. Ensure that the machine is grounded to zero before starting the machine to avoid leakage and cause unsafe accidents.
3. Before the blow molding machine is heated, it should be carefully checked whether the cooling water of each part is connected.
4. Before the automatic blow molding machine runs, raise the machine to the appropriate position to ensure that the machine head does not collide with the template to avoid damage to the equipment.
5. The pressure of the machine system has been set before leaving the factory. No special conditions can be adjusted freely to avoid damage to the hydraulic system or affect the normal operation of the machine due to excessive or too low pressure.
6. Workers are strictly prohibited from feeding on the machine to avoid electric shock or burns and falling from high altitude. (The machine should be equipped with an automatic loading device).
7. When the blow molding machine performs the mold shifting and closing operation, the operator is prohibited from entering the safety door area to avoid being pinched or injured.
8. When the automatic blow molding machine is in normal operation, do not use the hand to pull off the blank being extruded to avoid being burnt by the high temperature material and the electric hot knife or being pinched by the mold.
9. When adjusting the mold shifting and closing mode photoelectric switch, be sure to turn off the main oil pump to avoid the occurrence of unsafe accidents.
10. In case of emergency, quickly press the red emergency stop button to prevent accidents.

Label

Recently Viewed:

主站蜘蛛池模板: 桑日县| 丘北县| 习水县| 泸水县| 濮阳市| 抚松县| 南昌县| 容城县| 额济纳旗| 库尔勒市| 雷波县| 和平县| 屯昌县| 筠连县| 金昌市| 全椒县| 恩平市| 和静县| 河源市| 泸州市| 读书| 哈尔滨市| 南澳县| 金寨县| 方正县| 策勒县| 永年县| 集安市| 勃利县| 佳木斯市| 乌海市| 绥江县| 特克斯县| 灌云县| 江川县| 齐河县| 胶州市| 鲜城| 阿城市| 敦化市| 来安县|